E-commerce logistics · 2024 · Manesar
Distribution Facility
320,000 sq ft jointless laser-screed slab. FM-2 superflat. Steel-fibre reinforced, densified and mechanically polished. Delivered in 14 weeks.
View project
A portfolio of Premium Floors projects — warehousing, cargo, pharmaceutical, electronics assembly and cold storage. Every slab below was designed, cast and signed off by the same team.
Every enquiry is read by our project engineering desk. We will scope the tolerance, the load and the timing before we ever quote.
Begin an enquiry